Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0917 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,576 | $13,517 | Implemented |
UD0917 # 05 Y:2014 | 05 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $14,607 | $30,000 | Not Implemented |
UD0917 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $6,046 | $6,000 | Not Implemented |
UD0916 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,270 | $0 | Not Implemented |
UD0916 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,027 | $0 | Not Implemented |
UD0916 # 03 Y:2014 | 03 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $6,076 | $11,700 | Not Implemented |
UD0916 # 04 Y:2014 | 04 | 2014 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $25,351 | $43,280 | Not Implemented |
UD0916 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,413 | $26,040 | Not Implemented |
UD0916 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $503 | $500 | Implemented |
UD0916 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,426 | $4,150 | Not Implemented |
UD0916 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $896 | $0 | Not Implemented |
UD0916 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,978 | $1,000 | Implemented |
UD0916 # 10 Y:2014 | 10 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,562 | $110,000 | Implemented |
UD0916 # 11 Y:2014 | 11 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $9,661 | $40,000 | Not Implemented |
UD0916 # 12 Y:2014 | 12 | 2014 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,800 | $0 | Implemented |
UD0915 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,262 | $0 | Implemented |
UD0915 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,184 | $1,200 | Implemented |
UD0915 # 03 Y:2014 | 03 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,714 | $1,800 | Implemented |
UD0915 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,815 | $100 | Implemented |
UD0915 # 05 Y:2014 | 05 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,180 | $700 | Not Implemented |
UD0915 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,210 | $23,600 | Not Implemented |
UD0915 # 07 Y:2014 | 07 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $993 | $2,575 | Not Implemented |
UD0915 # 08 Y:2014 | 08 | 2014 | COVER OPEN TANKS | $14,519 | $39,186 | Not Implemented |
UD0915 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $129,321 | $377,745 | Not Implemented |
UD0915 # 10 Y:2014 | 10 | 2014 | ADD AREA LIGHTING SWITCHES | $117 | $0 | Not Implemented |