Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0064 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,099 | $9,475 | Implemented |
LM0064 # 05 Y:2003 | 05 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $9,529 | $0 | Not Implemented |
LM0064 # 06 Y:2003 | 06 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,520 | $0 | Implemented |
LM0064 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $453 | $400 | Implemented |
LM0064 # 08 Y:2003 | 08 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,674 | $300 | Not Implemented |
LM0064 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $123,760 | $56,040 | n/a |
LM0064 # 10 Y:2003 | 10 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $144,153 | $2,500 | Not Implemented |
LM0064 # 11 Y:2003 | 11 | 2003 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $360,180 | $118,080 | Implemented |
LM0064 # 12 Y:2003 | 12 | 2003 | MODIFY CURRENT INCENTIVE PROGRAM | $34,000 | $5,000 | Implemented |
LM0064 # 13 Y:2003 | 13 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $84,000 | $1,000 | Not Implemented |
MI0060 # 01 Y:2003 | 01 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,444 | $513 | Implemented |
MI0060 # 02 Y:2003 | 02 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $1,282 | $57 | Implemented |
MI0060 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $49,692 | $22,500 | Not Implemented |
MI0060 # 04 Y:2003 | 04 | 2003 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,768 | $4,500 | Not Implemented |
MI0060 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $943 | $1,792 | Not Implemented |
MI0060 # 06 Y:2003 | 06 | 2003 | METER WASTE WATER | $36,908 | $1,950 | Implemented |
MI0060 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $971 | $258 | Implemented |
NC0258 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $219,783 | $413,700 | Not Implemented |
NC0258 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,067 | $15,000 | Not Implemented |
NC0258 # 03 Y:2003 | 03 | 2003 | BURN A LESS EXPENSIVE GRADE OF FUEL | $182,984 | $375,000 | Not Implemented |
NC0258 # 04 Y:2003 | 04 | 2003 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $110,788 | $400,000 | Not Implemented |
NC0258 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $50 | Implemented |
NC0258 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $763 | $1,147 | Not Implemented |
NC0258 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,881 | $600 | Implemented |
IA0319 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,975 | $383 | Implemented |