Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1041 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,327 | $0 | Not Implemented |
UD1041 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,960 | $604 | Not Implemented |
UD1041 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,702 | $0 | Not Implemented |
UD1041 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,148 | $18,523 | Not Implemented |
UD1041 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $26,031 | $45,000 | Not Implemented |
UA0258 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,172 | $1,000 | Implemented |
UA0258 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,325 | $2,961 | Not Implemented |
UA0258 # 03 Y:2022 | 03 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,610 | $7,484 | Not Implemented |
UA0258 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,159 | $787 | Implemented |
UA0258 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,324 | $2,000 | Implemented |
UA0258 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $1,756 | $3,299 | Implemented |
ORC001 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,145 | $29,612 | Implemented |
ORC001 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $455 | $1,200 | Implemented |
ORC001 # 03 Y:2022 | 03 | 2022 | REDUCE VENTILATION AIR | $3,194 | $300 | Implemented |
ORC001 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,439 | $6,750 | Implemented |
LS1822 # 01 Y:2022 | 01 | 2022 | REDUCE HEAT GAIN BY WINDOW TINTING | $30,799 | $2,056 | Implemented |
LS1822 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,555 | $1,292 | Not Implemented |
LS1822 # 03 Y:2022 | 03 | 2022 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $190 | $125 | Not Implemented |
LS1822 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $49 | $50 | Implemented |
LS1822 # 05 Y:2022 | 05 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,150 | $23,430 | Implemented |
UF0580 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $383,709 | $1,629,000 | Not Implemented |
UF0580 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $44,200 | $57,498 | Implemented |
UF0580 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $18,832 | $31,696 | Implemented |
UF0580 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,115 | $20,214 | Implemented |
UF0580 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,686 | $42,931 | Not Implemented |