IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0599 # 09 Y:2023 09 2023 INSTALL TURBULATORS $4,318 $5,000 Implemented
UF0599 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $34,250 $2,384 Implemented
UF0599 # 11 Y:2023 11 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $5,191 $11,500 Not Implemented
UL2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,019 $0 Not Implemented
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2306 # 03 Y:2023 03 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,595 $12,891 Not Implemented
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $103,804 $14,859 Not Implemented
UU0222 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,013 $540 Implemented
UU0222 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,896 $2,400 Implemented
UU0222 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,681 $1,740 Not Implemented
UU0222 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,772 $46,800 Implemented
UU0222 # 05 Y:2023 05 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $35,027 $264,000 Not Implemented
UU0222 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $37,496 $421,400 Not Implemented
MU0033 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $1,490 $18 Not Implemented
MU0033 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $814 $270 Not Implemented
MU0033 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,285 $5,918 Not Implemented
MU0033 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,201 $0 Not Implemented
MU0033 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $872 $524 Not Implemented
MA0860 # 01 Y:2023 01 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,991 $1,650 n/a
MA0860 # 02 Y:2023 02 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,955 $500 n/a
MA0860 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $1,588 $5,500 n/a
GT0968 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,657 $1,850 Implemented
GT0968 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $104,725 $13,000 Implemented
GT0968 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,640 $23,680 Implemented