Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159,045
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0543 # 10 Y:2023 | 10 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,021 | $4,746 | n/a |
SD0645 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,027 | $20,044 | n/a |
SD0645 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,908 | $5,515 | n/a |
SD0645 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,560 | $10,840 | n/a |
SD0645 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,997 | $84,760 | n/a |
SD0645 # 05 Y:2024 | 05 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $48,532 | $0 | n/a |
SD0645 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,170 | $3,900 | n/a |
SD0645 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $1,694 | n/a |
SD0645 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $49,587 | $0 | n/a |
MI0431 # 01 Y:2023 | 01 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,840 | $55,500 | n/a |
MI0431 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,760 | $11,272 | n/a |
MI0431 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,963 | $16,003 | n/a |
MI0431 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $8,323 | $680 | n/a |
MI0431 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,269 | $1,020 | n/a |
MI0431 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,030 | $80 | n/a |
MI0431 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $816 | $1,400 | n/a |
AM0893 # 01 Y:2024 | 01 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $70,280 | $188,400 | n/a |
AM0893 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,610 | $86,040 | n/a |
AM0893 # 03 Y:2024 | 03 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,275 | $4,340 | n/a |
AM0893 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,555 | $3,000 | n/a |
AM0893 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,506 | $0 | n/a |
AM0893 # 06 Y:2024 | 06 | 2024 | USE PHOTOCELL CONTROLS | $131 | $42 | n/a |
AM0896 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $7,624 | $20,000 | n/a |
AM0896 # 02 Y:2024 | 02 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $298 | $8,505 | n/a |
AM0896 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,267 | $280,800 | n/a |