Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0699 # 02 Y:2000 | 02 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,694 | $0 | n/a |
GT0699 # 03 Y:2000 | 03 | 2000 | ISOLATE HOT OR COLD EQUIPMENT | $37,855 | $0 | n/a |
GT0699 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,198 | $1,000 | n/a |
GT0699 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $5,763 | $3,000 | n/a |
GT0699 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $680 | $600 | n/a |
GT0699 # 07 Y:2000 | 07 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $883 | $9,000 | n/a |
GT0699 # 08 Y:2000 | 08 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $505 | $900 | n/a |
GT0699 # 09 Y:2000 | 09 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,182 | $31,500 | n/a |
GT0699 # 10 Y:2000 | 10 | 2000 | COMBINE UTILITY METERS | $21,948 | $0 | n/a |
GT0699 # 11 Y:2000 | 11 | 2000 | MINIMIZE WATER USAGE | $207 | $205 | n/a |
GT0696 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,305 | $250 | Implemented |
GT0696 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45,153 | $5,000 | Not Implemented |
GT0696 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,306 | $8,892 | Not Implemented |
GT0696 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $1,317 | $1,375 | Implemented |
GT0696 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,419 | $8,778 | Implemented |
GT0696 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $100,083 | $160,000 | Not Implemented |
GT0696 # 07 Y:2000 | 07 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $7,200 | $0 | Implemented |
GT0696 # 08 Y:2000 | 08 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $360 | $0 | Implemented |
GT0697 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,385 | $46,235 | Implemented |
GT0697 # 02 Y:2000 | 02 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,208 | $4,355 | Not Implemented |
GT0697 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,700 | $37,500 | Not Implemented |
GT0697 # 04 Y:2000 | 04 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $38,825 | $600 | Implemented |
GT0697 # 05 Y:2000 | 05 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,825 | $2,850 | Implemented |
GT0697 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,480 | $26,340 | Not Implemented |
GT0697 # 07 Y:2000 | 07 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,000 | $3,800 | Implemented |