Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0986 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,208 $4,556 Implemented
OK0986 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,819 $4,198 Implemented
OK0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,714 $381 Not Implemented
OK0986 # 10 Y:2018 10 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $546 $1,200 Not Implemented
OK0986 # 11 Y:2018 11 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $183 Not Implemented
OK0986 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,065 $85,003 Implemented
OK0986 # 13 Y:2018 13 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $634,282 $3,891,600 Not Implemented
AM0747 # 01 Y:2018 01 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $170,240 $376,350 Not Implemented
AM0747 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,800 $121,500 Implemented
AM0747 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,900 $44,160 Implemented
AM0747 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,800 $39,100 Implemented
AM0747 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,680 $30 Not Implemented
MZ0247 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,241 $3,340 Not Implemented
MZ0247 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $13,764 $10,000 Not Implemented
MZ0247 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $6,231 $2,346 Implemented
MZ0247 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $4,900 Implemented
MZ0247 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,573 $500 Not Implemented
MZ0247 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,053 $170 Not Implemented
MZ0247 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,794 $740 Not Implemented
CL1801 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,074 $111,703 Not Implemented
CL1801 # 02 Y:2018 02 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $47,531 $15,500 Not Implemented
CL1801 # 03 Y:2018 03 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $25,853 $4,700 Not Implemented
CL1801 # 04 Y:2018 04 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,900 $22,500 Not Implemented
CL1801 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,775 $4,800 Not Implemented
CL1801 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,788 $2,080 Not Implemented