IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0545 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,536 $0 Implemented
SU0497 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,000 $0 Not Implemented
SU0497 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $327 $32 Implemented
SU0497 # 03 Y:2020 03 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,235 $257 Implemented
SU0497 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $177 $5,032 Implemented
SU0497 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $1,191 $882 Implemented
SU0497 # 06 Y:2020 06 2020 ELIMINATE/REDUCE AN OPERATION $1,415 $1,857 Not Implemented
SU0497 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $510 Implemented
SU0497 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,107 $51,554 Implemented
SU0497 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $131 $4,097 Not Implemented
MZ0284 # 01 Y:2020 01 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $2,928 $750 Implemented
MZ0284 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $14,842 $19,695 Implemented
MZ0284 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,682 $340 Not Implemented
MZ0284 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $640 Implemented
MZ0284 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,092 $320 Implemented
MZ0284 # 06 Y:2020 06 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $18,626 $1,400 Not Implemented
LS2005 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,727 $300 Not Implemented
LS2005 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $0 Implemented
LS2005 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $114 $50 Not Implemented
LS2005 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,208 $17,766 Not Implemented
LS2005 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $0 Implemented
LS2005 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $225,476 $1,204,486 Not Implemented
LE0490 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,133 $15,000 Implemented
LE0490 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,924 $40 Implemented
LE0490 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,376 $10,000 Not Implemented