IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0167 # 05 Y:2000 05 2000 CONVERT TO ELECTROSTATIC POWDER COATING $12,389 $35,000 Not Implemented
DS0167 # 06 Y:2000 06 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,104 $4,075 Not Implemented
DS0164 # 01 Y:2000 01 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,933 $564 Implemented
DS0164 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,164 $806 Implemented
DS0164 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $466 $237 Implemented
DS0164 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $155 $478 Implemented
DS0164 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $86 $108 Implemented
DS0164 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,246 $4,062 Not Implemented
DS0164 # 07 Y:2000 07 2000 USE RADIANT HEATER FOR SPOT HEATING $3,234 $12,690 Implemented
DS0164 # 08 Y:2000 08 2000 SELL COMBUSTIBLE WASTE $1,588 $6,250 Not Implemented
DS0164 # 09 Y:2000 09 2000 SELL COMBUSTIBLE WASTE $4,712 $934 Not Implemented
DS0164 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $2,533 $4,000 Implemented
DS0162 # 01 Y:2000 01 2000 USE OPTIMUM THICKNESS INSULATION $4,196 $3,997 n/a
DS0162 # 02 Y:2000 02 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $762 $0 n/a
DS0162 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,888 $6,600 n/a
DS0162 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $1,702 n/a
DS0162 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $499 $105 n/a
DS0162 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $252 $0 n/a
DS0162 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $420 $0 n/a
DS0143 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $135 Implemented
DS0143 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,177 $7,500 Implemented
DS0143 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,400 Implemented
DS0143 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $16,788 $3,567 Not Implemented
DS0143 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $16,588 $20 Not Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented