IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0253 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,009 $2,543 Not Implemented
OR0253 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,570 $35,000 Not Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
OR0251 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $17,025 Not Implemented
OR0251 # 04 Y:1995 04 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $145,120 $1,495,000 Not Implemented
OR0246 # 01 Y:1995 01 1995 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $12,000 $19,000 Not Implemented
OR0246 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,521 $6,281 Implemented
OR0246 # 03 Y:1995 03 1995 MINIMIZE WATER USAGE $3,070 $0 Implemented
OR0246 # 04 Y:1995 04 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $122,760 $205,000 Implemented
OR0246 # 05 Y:1995 05 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,530 $6,500 Implemented
OR0246 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $5,000 $14,000 Not Implemented
OR0245 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,044 $4,000 Implemented
OR0245 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $469 $0 Implemented
OR0245 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,558 $5,558 Not Implemented
OR0245 # 04 Y:1995 04 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $106,051 $89,900 Implemented
OR0245 # 05 Y:1995 05 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,155 $20,000 Implemented
OR0244 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,764 $14,938 Implemented
OR0244 # 02 Y:1995 02 1995 UPGRADE CONTROLS ON COMPRESSORS $1,725 $200 Implemented
OR0244 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $700 $1,195 Implemented
OR0244 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $14,400 $5,385 Not Implemented
OR0243 # 01 Y:1995 01 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,308 $0 Implemented
OR0243 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,093 $500 Implemented
OR0243 # 03 Y:1995 03 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $627 $198 Not Implemented
OR0243 # 04 Y:1995 04 1995 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,714 $2,108 Not Implemented