IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0459 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,750 $300 Implemented
OR0459 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $4,820 $36,600 Implemented
OR0459 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,250 $2,000 Implemented
OR0459 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,330 $2,825 Implemented
OR0459 # 06 Y:2004 06 2004 OPTIMIZE PLANT POWER FACTOR $2,730 $5,130 Implemented
UD0699 # 01 Y:2004 01 2004 $96,000 $204,300 Not Implemented
UD0699 # 02 Y:2004 02 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $85,223 $13,240 Not Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,114 $0 Not Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
UD0699 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $890 Not Implemented
WI0475 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $97,164 $40,200 Not Implemented
WI0475 # 02 Y:2004 02 2004 COVER OPEN TANKS $18,376 $1,000 Implemented
WI0475 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,417 $33,120 Implemented
WI0475 # 04 Y:2004 04 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,708 $0 Not Implemented
WI0475 # 05 Y:2004 05 2004 USE SYNTHETIC LUBRICANT $4,236 $0 Not Implemented
WI0475 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,127 $1,976 Implemented
WI0475 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,987 $1,920 Implemented
WI0475 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $80 Implemented
WI0475 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,527 $5,140 Not Implemented
IC0082 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $158,811 $0 Implemented