Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0459 # 02 Y:2004 | 02 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,750 | $300 | Implemented |
OR0459 # 03 Y:2004 | 03 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $4,820 | $36,600 | Implemented |
OR0459 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $34,250 | $2,000 | Implemented |
OR0459 # 05 Y:2004 | 05 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,330 | $2,825 | Implemented |
OR0459 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $2,730 | $5,130 | Implemented |
UD0699 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,000 | $204,300 | Not Implemented |
UD0699 # 02 Y:2004 | 02 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $85,223 | $13,240 | Not Implemented |
UD0699 # 03 Y:2004 | 03 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $297,217 | $0 | Implemented |
UD0699 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,114 | $0 | Not Implemented |
UD0699 # 05 Y:2004 | 05 | 2004 | DISCONNECT BALLASTS | $7,031 | $377 | Implemented |
UD0699 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,689 | $0 | Implemented |
UD0699 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,162 | $8,406 | Implemented |
UD0699 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $255 | Implemented |
UD0699 # 09 Y:2004 | 09 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $775 | $0 | Implemented |
UD0699 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $276 | $890 | Not Implemented |
WI0475 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $97,164 | $40,200 | Not Implemented |
WI0475 # 02 Y:2004 | 02 | 2004 | COVER OPEN TANKS | $18,376 | $1,000 | Implemented |
WI0475 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,417 | $33,120 | Implemented |
WI0475 # 04 Y:2004 | 04 | 2004 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,708 | $0 | Not Implemented |
WI0475 # 05 Y:2004 | 05 | 2004 | USE SYNTHETIC LUBRICANT | $4,236 | $0 | Not Implemented |
WI0475 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,127 | $1,976 | Implemented |
WI0475 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,987 | $1,920 | Implemented |
WI0475 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,924 | $80 | Implemented |
WI0475 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,527 | $5,140 | Not Implemented |
IC0082 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $158,811 | $0 | Implemented |