IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0781 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,710 $7,720 Implemented
AM0781 # 04 Y:2019 04 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $762 Not Implemented
AM0781 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $780 Implemented
AS0471 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85,359 $279,692 Implemented
AS0471 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,374 $5,020 Not Implemented
AS0471 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,003 $2,108 Not Implemented
AS0471 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $157 $0 Implemented
UD0996 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,447 $0 Implemented
UD0996 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,125 $0 Not Implemented
UD0996 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,446 $0 Not Implemented
UD0996 # 04 Y:2019 04 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $618 $0 Not Implemented
UD0996 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $618 $0 Implemented
UD0996 # 06 Y:2019 06 2019 COVER OPEN TANKS $8,047 $1,400 Not Implemented
UD0996 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $18,128 $3,500 Not Implemented
UD0996 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $127,402 $60,000 Implemented
UD0996 # 09 Y:2019 09 2019 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $48,531 $11,000 Implemented
UD0996 # 10 Y:2019 10 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $37,159 $98,800 Not Implemented
UD0996 # 11 Y:2019 11 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,290 $5,250 Not Implemented
UD0996 # 12 Y:2019 12 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,848 $80,000 Implemented
TT0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,132 $36,211 Implemented
TT0221 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $4,069 $2,280 Not Implemented
TT0221 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,958 $7,400 Not Implemented
TT0221 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,435 $30 Not Implemented
TT0221 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $33 $80 Not Implemented
UF0529 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $109,260 $320,000 Implemented