IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0234 # 05 Y:2003 05 2003 COVER OPEN TANKS $8,523 $2,000 Not Implemented
UM0234 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,198 $5,219 Not Implemented
UM0233 # 01 Y:2003 01 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,800 $32,000 Not Implemented
UM0233 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,064 $500 Implemented
UM0233 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $150 Implemented
UM0233 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,037 $50 Implemented
UM0233 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $26,000 $119,000 Implemented
UM0232 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,492 $5,655 Not Implemented
UM0232 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,683 $2,100 Implemented
UM0232 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,416 $10,600 Not Implemented
UM0232 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,706 $1,660 Not Implemented
UM0232 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,693 $1,000 Implemented
UM0232 # 06 Y:2003 06 2003 INSTALL COMMON HEADER ON COMPRESSORS $13,700 $6,480 Implemented
UM0231 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,750 $7,445 Not Implemented
UM0231 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,000 $2,250 Not Implemented
UM0231 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,320 $1,500 Not Implemented
UM0231 # 04 Y:2003 04 2003 HEAT WATER WITH EXHAUST HEAT $6,519 $7,500 Not Implemented
UM0231 # 05 Y:2003 05 2003 REPLACE BOILER $6,310 $2,500 Not Implemented
UM0230 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,775 $18,691 Not Implemented
UM0230 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,479 $300 Not Implemented
UM0230 # 03 Y:2003 03 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,163 $4,500 Implemented
UM0230 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,688 $8,100 n/a
UM0230 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $37,100 $171,200 Not Implemented
UM0230 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $4,200 $1,500 Not Implemented
UM0229 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,914 $100,000 Not Implemented