Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0439 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,293 | $950 | Implemented |
AS0439 # 04 Y:2017 | 04 | 2017 | MAINTAIN MACHINES TO REDUCE LEAKS | $734 | $545 | Not Implemented |
MA0774 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $58,825 | $627,522 | Implemented |
MA0774 # 02 Y:2017 | 02 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,851 | $21,075 | Not Implemented |
MA0774 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,135 | $27,198 | Not Implemented |
MA0774 # 04 Y:2017 | 04 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,868 | $652 | Implemented |
MA0774 # 05 Y:2017 | 05 | 2017 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,908 | $1,775 | Implemented |
LE0437 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,220 | $7,000 | Not Implemented |
LE0437 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,208 | $20,000 | Not Implemented |
LE0437 # 03 Y:2017 | 03 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $37,770 | $36,000 | Not Implemented |
LE0437 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,482 | $14,000 | Not Implemented |
LE0437 # 05 Y:2017 | 05 | 2017 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $35,693 | $50,000 | Not Implemented |
LE0437 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,862 | $12,000 | Not Implemented |
LE0437 # 07 Y:2017 | 07 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $86,210 | $200,000 | Not Implemented |
LE0437 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,363 | $60,000 | Not Implemented |
IP0084 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,680 | $25,865 | Implemented |
IP0084 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,043 | $0 | Not Implemented |
IP0084 # 02 Y:2017 | 02 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $131 | $0 | Implemented |
IP0084 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $4 | Not Implemented |
IP0084 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,458 | $65 | Implemented |
IP0084 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,415 | $130 | Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $974 | $203 | Implemented |
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |