Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0290 # 10 Y:2005 | 10 | 2005 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $396 | $750 | Implemented |
BD0290 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $265 | Implemented |
BD0290 # 12 Y:2005 | 12 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,604 | $2,500 | Not Implemented |
BD0290 # 13 Y:2005 | 13 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,381 | $700 | Implemented |
BD0290 # 14 Y:2005 | 14 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $406 | $450 | Implemented |
BD0290 # 15 Y:2005 | 15 | 2005 | METER WASTE WATER | $728 | $250 | Implemented |
MA0579 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,816 | $7,000 | Implemented |
MA0579 # 02 Y:2005 | 02 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,934 | $4,500 | Not Implemented |
MA0579 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,785 | $350 | Not Implemented |
MA0579 # 04 Y:2005 | 04 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,893 | $4,197 | Implemented |
MA0579 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,427 | $7,389 | Implemented |
MA0579 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,484 | $450 | Implemented |
MA0579 # 07 Y:2005 | 07 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,309 | $9,650 | Not Implemented |
MA0579 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $647 | $1,170 | Implemented |
MA0579 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,755 | $64,891 | Not Implemented |
UU0086 # 01 Y:2005 | 01 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,056 | $12,620 | Not Implemented |
UU0086 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,984 | $6,400 | Not Implemented |
UU0086 # 03 Y:2005 | 03 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,445 | $3,600 | Not Implemented |
UU0086 # 04 Y:2005 | 04 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,447 | $21,000 | Not Implemented |
UU0086 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $773 | $4,320 | Not Implemented |
UU0086 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $15,260 | $14,000 | Not Implemented |
WV0317 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,323 | $0 | Not Implemented |
WV0317 # 02 Y:2005 | 02 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $23,795 | $50,000 | Not Implemented |
WV0317 # 03 Y:2005 | 03 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,415 | $5,677 | Not Implemented |
WV0317 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,217 | $490 | Implemented |