Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0034 # 07 Y:2009 | 07 | 2009 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,000 | $0 | Implemented |
TT0034 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,400 | $0 | Implemented |
OK0774 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $607 | $1,902 | Not Implemented |
OK0774 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,831 | $0 | Implemented |
OK0774 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $365 | $1,154 | Implemented |
OK0774 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $229 | $1,891 | Not Implemented |
OK0774 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $825 | $5,760 | Not Implemented |
OK0774 # 06 Y:2009 | 06 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $400 | $0 | Not Implemented |
UD0793 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,450 | $25,000 | Implemented |
UD0793 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $6,677 | $1,000 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 04 Y:2009 | 04 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,855 | $0 | Implemented |
UD0793 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,799 | $400 | Not Implemented |
UD0793 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,114 | $0 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |
UD0793 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,256 | $4,820 | Not Implemented |
UD0793 # 11 Y:2009 | 11 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $621 | $1,000 | Implemented |
UD0793 # 12 Y:2009 | 12 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $435 | $0 | Not Implemented |
SD0413 # 01 Y:2009 | 01 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $151,192 | $1,125,000 | Not Implemented |
SD0413 # 02 Y:2009 | 02 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $57,036 | $120,000 | Implemented |
SD0413 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $31,920 | $13,200 | Implemented |
SD0413 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Implemented |
SD0413 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Implemented |