IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0034 # 07 Y:2009 07 2009 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,000 $0 Implemented
TT0034 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,400 $0 Implemented
OK0774 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $607 $1,902 Not Implemented
OK0774 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $0 Implemented
OK0774 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $365 $1,154 Implemented
OK0774 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,891 Not Implemented
OK0774 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $5,760 Not Implemented
OK0774 # 06 Y:2009 06 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $400 $0 Not Implemented
UD0793 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $25,000 Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented
UD0793 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,960 $500 Not Implemented
UD0793 # 04 Y:2009 04 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,855 $0 Implemented
UD0793 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,799 $400 Not Implemented
UD0793 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,114 $0 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented
UD0793 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,256 $4,820 Not Implemented
UD0793 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,000 Implemented
UD0793 # 12 Y:2009 12 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $435 $0 Not Implemented
SD0413 # 01 Y:2009 01 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $151,192 $1,125,000 Not Implemented
SD0413 # 02 Y:2009 02 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $57,036 $120,000 Implemented
SD0413 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $31,920 $13,200 Implemented
SD0413 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,991 $20,850 Implemented
SD0413 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,118 $9,600 Implemented