IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0114 # 02 Y:1998 02 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $143 $80 Implemented
OD0114 # 03 Y:1998 03 1998 SHUT OFF PILOTS IN STANDBY EQUIPMENT $35 $10 Implemented
OD0114 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,303 $509 Implemented
OD0114 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,123 $50 Not Implemented
OD0114 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $538 $1,010 Not Implemented
OD0114 # 07 Y:1998 07 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $17,428 $9,180 Not Implemented
MS0115 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $130 $335 Implemented
MS0115 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $384 Implemented
MS0115 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,226 $1,332 Not Implemented
MS0115 # 04 Y:1998 04 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $62,615 $4,720 Implemented
MS0115 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $75 $0 Not Implemented
MS0115 # 06 Y:1998 06 1998 METER WASTE WATER $1,274 $0 Implemented
MS0115 # 07 Y:1998 07 1998 METER WASTE WATER $68 $25 Implemented
MS0115 # 08 Y:1998 08 1998 EXPAND OPERATIONS INTO UNUSED SPACE $181,522 $600,000 Implemented
MS0115 # 09 Y:1998 09 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $274,300 $60,000 Implemented
TN0635 # 01 Y:1998 01 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $429,120 $36,880 Not Implemented
TN0635 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $39,020 $13,600 Implemented
TN0635 # 03 Y:1998 03 1998 USE MINIMUM STEAM OPERATING PRESSURE $22,590 $46,880 Not Implemented
TN0635 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $9,760 $3,580 Implemented
TN0635 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,180 $0 Not Implemented
WV0148 # 01 Y:1998 01 1998 COVER OPEN TANKS $38,890 $16,000 Not Implemented
WV0148 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $186 $80 Implemented
WV0148 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,769 $825 Implemented
WV0148 # 04 Y:1998 04 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $47,874 $0 Implemented
WV0148 # 05 Y:1998 05 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,177 $11,000 Not Implemented