IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0028 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,571 $300 Implemented
AR0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,490 $7,600 Implemented
AR0028 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $913 Implemented
AR0028 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,367 $495 Implemented
AR0028 # 05 Y:1994 05 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $37,510 $30,000 Not Implemented
AR0028 # 06 Y:1994 06 1994 AIR CONDITION ONLY SPACE NECESSARY $2,792 $1,000 Implemented
IA0088 # 01 Y:1994 01 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,839 $32,340 Not Implemented
IA0088 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,944 $400 Implemented
IA0088 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,089 $800 Implemented
IA0088 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,958 $1,905 Implemented
IA0088 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $652 $1,050 Not Implemented
IA0088 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $5,083 Not Implemented
IA0088 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $56 Implemented
ME0138 # 01 Y:1994 01 1994 RECOVER AND REUSE COOLING WATER $6,000 $3,400 Not Implemented
ME0138 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,891 $20 Not Implemented
ME0138 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $2,933 $4,200 Not Implemented
ME0138 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,480 $1,140 Not Implemented
ME0138 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $520 $1,000 Not Implemented
ME0138 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $500 Not Implemented
ME0138 # 07 Y:1994 07 1994 INSULATE FEEDWATER TANK $171 $68 Not Implemented
OR0210 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $1,701 $1,030 Not Implemented
OR0210 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $300 Implemented
OR0210 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $139 Implemented
OR0210 # 04 Y:1994 04 1994 USE A DIFFERENT OR RECYCLED RAW MATERIAL $124,000 $118,900 Implemented
TN0532 # 01 Y:1994 01 1994 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,297 $17,400 Not Implemented