IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0626 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $2,526 Implemented
UD0626 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $514 $0 Not Implemented
SD0283 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,925 $144,000 Not Implemented
SD0283 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,393 $480 Implemented
SD0283 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,243 $6,000 Not Implemented
SD0283 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,566 $5,950 Not Implemented
SD0283 # 05 Y:2001 05 2001 INSTALL SKYLIGHTS $9,916 $28,500 Not Implemented
SD0283 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,992 $2,300 Implemented
SD0283 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,044 $18,000 Implemented
SD0283 # 08 Y:2001 08 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $476,943 $325,000 Not Implemented
SD0283 # 09 Y:2001 09 2001 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $385,010 $152,000 Not Implemented
SD0283 # 10 Y:2001 10 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $2,622,000 $180,000 Not Implemented
SD0283 # 11 Y:2001 11 2001 INSTALL BACK-UP EQUIPMENT $110,362 $400,000 Not Implemented
WV0217 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,319 $1,925 Implemented
WV0217 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,187 $0 Implemented
WV0217 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,084 $54 Implemented
WV0217 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,646 $162 Implemented
WV0217 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $68 Implemented
WV0217 # 06 Y:2001 06 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,151 $270 Implemented
WV0217 # 07 Y:2001 07 2001 BURN WOOD BY-PRODUCTS FOR HEAT $136,561 $325,000 Not Implemented
WV0217 # 08 Y:2001 08 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $16,050 $15,248 Implemented
WV0217 # 09 Y:2001 09 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $30,000 Not Implemented
CO0486 # 01 Y:2001 01 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $298,800 $962,500 Not Implemented
CO0486 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105,800 $28,000 n/a
CO0486 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $22,640 $68,400 Not Implemented