IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0554 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $330 $1,200 Implemented
IP0064 # 01 Y:2016 01 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $839 $0 Implemented
IP0064 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $5 Implemented
IP0064 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,306 $250 Implemented
IP0064 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,082 $700 Implemented
IP0064 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $878 Implemented
IP0064 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $382 $888 Implemented
IP0064 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $3,007 Implemented
BD0481 # 01 Y:2016 01 2016 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $8,603 $10,500 Not Implemented
BD0481 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,932 $50 Not Implemented
BS0073 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,312 Not Implemented
BS0073 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $960 Not Implemented
BS0073 # 03 Y:2016 03 2016 USE OPTIMUM TEMPERATURE $419 $116 Not Implemented
BS0073 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $47 Not Implemented
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
BS0073 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,966 $15,800 Not Implemented
TT0170 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,371 $30,500 Not Implemented
TT0170 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,212 $1,500 Implemented
TT0170 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,194 $3,000 Implemented
TT0170 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,630 $3,525 Implemented
TT0170 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,494 $130 Implemented
BD0480 # 01 Y:2016 01 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $19,348 $3,000 n/a
BD0480 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,253 $17,970 n/a
BD0480 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,798 $20,250 n/a