IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0278 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,143 $0 Not Implemented
TT0278 # 07 Y:2022 07 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,425 $0 Implemented
TT0278 # 08 Y:2022 08 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,362 $2,736 Implemented
UF0578 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,842 $11,742 Implemented
UF0578 # 02 Y:2022 02 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $12,457 $4,590 Not Implemented
UF0578 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,829 $2,419 Implemented
UF0578 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,565 $25,400 Not Implemented
UF0578 # 05 Y:2022 05 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,688 $0 Implemented
UF0578 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,461 $390 Implemented
UF0578 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $0 Implemented
UF0578 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,065 $1,710 Implemented
SF0585 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,341 $0 Implemented
SF0585 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,174 $2,893 Implemented
SF0585 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,840 $8,000 Not Implemented
SF0585 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $897 $400 Implemented
SF0585 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $3,867 $8,345 Implemented
SF0585 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $95,415 $561,099 Not Implemented
SF0585 # 07 Y:2022 07 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,102 $105,401 Not Implemented
OK1072 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $0 Implemented
OK1072 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,749 $0 Not Implemented
OK1072 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $439 $2,000 Not Implemented
OK1072 # 04 Y:2022 04 2022 INSTALL SUB-METERING EQUIPMENT $173,223 $1,272 Not Implemented
OK1072 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $265,528 $1,357,737 Not Implemented
TT0273 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $197,305 $1,241,200 Not Implemented
TT0273 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65,016 $5,000 Implemented