Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1039 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $316 | Not Implemented |
UD1039 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $50 | Not Implemented |
UD1039 # 07 Y:2022 | 07 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,304 | $2,369 | Not Implemented |
SF0585 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,341 | $0 | Implemented |
SF0585 # 02 Y:2022 | 02 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,174 | $2,893 | Implemented |
SF0585 # 03 Y:2022 | 03 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $23,840 | $8,000 | Not Implemented |
SF0585 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $897 | $400 | Implemented |
SF0585 # 05 Y:2022 | 05 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $3,867 | $8,345 | Implemented |
SF0585 # 06 Y:2022 | 06 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,415 | $561,099 | Not Implemented |
SF0585 # 07 Y:2022 | 07 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $17,102 | $105,401 | Not Implemented |
UF0578 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,842 | $11,742 | Implemented |
UF0578 # 02 Y:2022 | 02 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $12,457 | $4,590 | Not Implemented |
UF0578 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,829 | $2,419 | Implemented |
UF0578 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,565 | $25,400 | Not Implemented |
UF0578 # 05 Y:2022 | 05 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,688 | $0 | Implemented |
UF0578 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,461 | $390 | Implemented |
UF0578 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,930 | $0 | Implemented |
UF0578 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,065 | $1,710 | Implemented |
UL2205 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,490 | $11,516 | Implemented |
UL2205 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $83,199 | $100,000 | Not Implemented |
UL2205 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,954 | $524,616 | Not Implemented |
UL2205 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $427,303 | $4,465,290 | Not Implemented |
UL2205 # 05 Y:2022 | 05 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,986 | $0 | Implemented |
CC0003 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,652 | $12,041 | n/a |
CC0003 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $0 | n/a |