Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0166 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $562 | $3,120 | Not Implemented |
UM0166 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,705 | $5,925 | Implemented |
TN0691 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $144,950 | $100,000 | Not Implemented |
TN0691 # 02 Y:2000 | 02 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $110,155 | $5,075 | Not Implemented |
TN0691 # 03 Y:2000 | 03 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $85,000 | $16,580 | Not Implemented |
TN0691 # 04 Y:2000 | 04 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,545 | $18,900 | Not Implemented |
TN0691 # 05 Y:2000 | 05 | 2000 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $11,700 | $35,640 | Not Implemented |
TN0691 # 06 Y:2000 | 06 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $10,100 | $0 | Not Implemented |
TN0691 # 07 Y:2000 | 07 | 2000 | INSTALL SKYLIGHTS | $2,160 | $9,680 | Not Implemented |
TN0691 # 08 Y:2000 | 08 | 2000 | USE RE-USABLE FILTERS | $640 | $0 | Implemented |
UD0600 # 01 Y:2000 | 01 | 2000 | DEVELOP STANDARD OPERATING PROCEDURES | $74,100 | $16,000 | Implemented |
UD0600 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $11,664 | $4,200 | Not Implemented |
UD0600 # 03 Y:2000 | 03 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,810 | $0 | Not Implemented |
UD0600 # 04 Y:2000 | 04 | 2000 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $3,780 | $1,200 | Not Implemented |
UD0600 # 05 Y:2000 | 05 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,938 | $7,000 | Not Implemented |
HO0232 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,133 | $35,343 | Implemented |
HO0232 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,004 | $0 | Not Implemented |
HO0232 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $11,219 | $2,000 | Not Implemented |
HO0232 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $252 | $600 | Not Implemented |
HO0232 # 05 Y:2000 | 05 | 2000 | USE COMPRESSOR AIR FILTERS | $2,211 | $150 | Not Implemented |
HO0232 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,237 | $1,200 | Not Implemented |
HO0232 # 07 Y:2000 | 07 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $18,455 | $60,000 | Not Implemented |
HO0232 # 08 Y:2000 | 08 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,647 | $4,134 | Not Implemented |
HO0232 # 09 Y:2000 | 09 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $18,360 | $8,000 | Not Implemented |
HO0232 # 10 Y:2000 | 10 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $61,200 | $640 | Not Implemented |