IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0166 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $562 $3,120 Not Implemented
UM0166 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,705 $5,925 Implemented
TN0691 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $144,950 $100,000 Not Implemented
TN0691 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $110,155 $5,075 Not Implemented
TN0691 # 03 Y:2000 03 2000 MODIFY CURRENT INCENTIVE PROGRAM $85,000 $16,580 Not Implemented
TN0691 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,545 $18,900 Not Implemented
TN0691 # 05 Y:2000 05 2000 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $11,700 $35,640 Not Implemented
TN0691 # 06 Y:2000 06 2000 RECOVER AND REUSE WASTE MATERIAL $10,100 $0 Not Implemented
TN0691 # 07 Y:2000 07 2000 INSTALL SKYLIGHTS $2,160 $9,680 Not Implemented
TN0691 # 08 Y:2000 08 2000 USE RE-USABLE FILTERS $640 $0 Implemented
UD0600 # 01 Y:2000 01 2000 DEVELOP STANDARD OPERATING PROCEDURES $74,100 $16,000 Implemented
UD0600 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $11,664 $4,200 Not Implemented
UD0600 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,810 $0 Not Implemented
UD0600 # 04 Y:2000 04 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $3,780 $1,200 Not Implemented
UD0600 # 05 Y:2000 05 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,938 $7,000 Not Implemented
HO0232 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,133 $35,343 Implemented
HO0232 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,004 $0 Not Implemented
HO0232 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $11,219 $2,000 Not Implemented
HO0232 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $252 $600 Not Implemented
HO0232 # 05 Y:2000 05 2000 USE COMPRESSOR AIR FILTERS $2,211 $150 Not Implemented
HO0232 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,237 $1,200 Not Implemented
HO0232 # 07 Y:2000 07 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $18,455 $60,000 Not Implemented
HO0232 # 08 Y:2000 08 2000 OPTIMIZE PLANT POWER FACTOR $2,647 $4,134 Not Implemented
HO0232 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $18,360 $8,000 Not Implemented
HO0232 # 10 Y:2000 10 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $61,200 $640 Not Implemented