Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0946 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $462 | $2,400 | Implemented |
UD0946 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $214 | $0 | Not Implemented |
BS0072 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $233 | $48 | Not Implemented |
BS0072 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $56 | $47 | Not Implemented |
BS0072 # 03 Y:2016 | 03 | 2016 | PAY UTILITY BILLS ON TIME | $217 | $63 | Not Implemented |
BS0072 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,231 | $15,400 | Not Implemented |
BS0072 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $240 | $413 | Not Implemented |
BS0072 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $547 | $582 | Not Implemented |
BS0072 # 07 Y:2016 | 07 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,023 | $3,260 | Not Implemented |
BS0072 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $284 | $1,323 | Not Implemented |
UA0159 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $660,652 | $392,000 | Not Implemented |
UA0159 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $193,333 | $84,408 | Not Implemented |
UA0159 # 03 Y:2016 | 03 | 2016 | COVER OPEN TANKS | $286,063 | $140,000 | Not Implemented |
UA0159 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,382 | $2,400 | Implemented |
UA0159 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $219,290 | $1,047,803 | Not Implemented |
UA0159 # 06 Y:2016 | 06 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $82,252 | $55 | Implemented |
UA0159 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,391 | $20,000 | Not Implemented |
UA0159 # 08 Y:2016 | 08 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $88,918 | $2,750 | Not Implemented |
UA0160 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $221,404 | $94,081 | Not Implemented |
UA0160 # 02 Y:2016 | 02 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $85,894 | $0 | Implemented |
UA0160 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $83,969 | $169,192 | Not Implemented |
UA0160 # 04 Y:2016 | 04 | 2016 | USE PHOTOCELL CONTROLS | $3,368 | $1,162 | Not Implemented |
UA0160 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,685 | $1,300 | Implemented |
UA0160 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,141 | $700 | Not Implemented |
UA0160 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,220 | $2,995 | Implemented |