IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0485 # 03 Y:2014 03 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,371 $10,550 Not Implemented
WV0485 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,211 $2,981 Implemented
WV0485 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,703 $500 Implemented
WV0485 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,806 $4,815 Not Implemented
WV0485 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $175 Implemented
WV0485 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,805 $3,000 Implemented
WV0485 # 09 Y:2014 09 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,922 $1,719 Not Implemented
WV0485 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,433 Not Implemented
WV0485 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,516 $696 Implemented
WV0485 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $426 Implemented
WV0484 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,596 $58,450 Not Implemented
WV0484 # 02 Y:2014 02 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $24,659 $51,000 Not Implemented
WV0484 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $11,868 $7,750 Implemented
WV0484 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,987 $3,690 Not Implemented
WV0484 # 05 Y:2014 05 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,830 $5,600 Not Implemented
WV0484 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,252 $4,500 Implemented
WV0484 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,693 $468 Implemented
WV0484 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,298 $0 Implemented
WV0484 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,489 $6,113 Implemented
UD0899 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $0 Implemented
UD0899 # 03 Y:2014 03 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $85 $0 Not Implemented
UD0899 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,795 $4,550 Not Implemented
UD0899 # 05 Y:2014 05 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $2,075 $0 Implemented
UD0899 # 06 Y:2014 06 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,303 $0 Implemented
UD0899 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,350 $7,126 Not Implemented