Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0001 # 03 Y:2012 | 03 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $488 | $0 | Not Implemented |
WM0001 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,696 | $0 | Not Implemented |
WM0001 # 05 Y:2012 | 05 | 2012 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $27,100 | $78,000 | Not Implemented |
WM0001 # 06 Y:2012 | 06 | 2012 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $236 | $79 | Not Implemented |
WM0001 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $1,000 | Implemented |
WM0001 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,227 | $1,535 | Implemented |
UM0401 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,538 | $1,500 | Not Implemented |
UM0401 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $5,655 | $21,250 | Not Implemented |
UM0401 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,019 | $5,000 | Implemented |
UM0401 # 04 Y:2012 | 04 | 2012 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,066 | $448 | Implemented |
OR0583 # 01 Y:2012 | 01 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $3,140 | $2,412 | Implemented |
OR0583 # 02 Y:2012 | 02 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,994 | $10,000 | Not Implemented |
OR0583 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,663 | $19,592 | Implemented |
OR0583 # 04 Y:2012 | 04 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,078 | $500 | Implemented |
OR0583 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,391 | $3,854 | Implemented |
OR0583 # 06 Y:2012 | 06 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,779 | $6,600 | Implemented |
OR0582 # 01 Y:2012 | 01 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $720 | $500 | Not Implemented |
OR0582 # 02 Y:2012 | 02 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $25,857 | $33,400 | Not Implemented |
OR0582 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,291 | $23,135 | Not Implemented |
OR0582 # 04 Y:2012 | 04 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,435 | $34,000 | Not Implemented |
MI0221 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,726 | $1,800 | Implemented |
MI0221 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,561 | $1,660 | Implemented |
MI0221 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,281 | $11,600 | Implemented |
MI0221 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,238 | $80 | Implemented |
MI0221 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,133 | $5,826 | Not Implemented |