IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0450 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $7,821 Not Implemented
WI0450 # 07 Y:2003 07 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,800 $0 Not Implemented
WI0449 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,913 $47,600 Not Implemented
WI0449 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,417 $29,500 Not Implemented
WI0449 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,045 $0 Not Implemented
WI0449 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $16,308 $2,000 Not Implemented
WI0449 # 05 Y:2003 05 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,783 $15,000 Not Implemented
WI0449 # 06 Y:2003 06 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $5,589 $0 Not Implemented
WI0449 # 07 Y:2003 07 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,048 $3,500 Not Implemented
WI0449 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $905 $640 Not Implemented
WI0448 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $610 $300 Implemented
WI0448 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $509 $1,280 Not Implemented
WI0448 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,587 $13,005 Implemented
WI0448 # 02 Y:2003 02 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,564 $4,300 Not Implemented
WI0448 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,434 $1,918 Not Implemented
WI0448 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,870 $5,000 Not Implemented
WI0448 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,558 $1,200 Not Implemented
WI0448 # 06 Y:2003 06 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $962 $500 Not Implemented
WI0447 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,019 $150,000 Not Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 03 Y:2003 03 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,071 $2,000 Not Implemented
WI0447 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $740 Not Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented
WI0446 # 01 Y:2003 01 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,491 $40,000 Implemented
WI0446 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,813 $15,675 n/a