IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0216 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $22,605 $175,000 Not Implemented
WV0216 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,413 $1,000 Implemented
WV0216 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,970 $4,460 Not Implemented
WV0216 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,557 $1,500 Implemented
WV0216 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $99 $80 Implemented
WV0216 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,354 $75 Implemented
WV0216 # 08 Y:2001 08 2001 BURN WASTE OIL FOR HEAT $55,440 $10,000 Implemented
WV0216 # 09 Y:2001 09 2001 LEASE EQUIPMENT INSTEAD OF PURCHASING $2,250 $200 Not Implemented
WV0216 # 10 Y:2001 10 2001 CLEAR AND RENT EXISTING SPACE $6,000 $500 Not Implemented
UD0625 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,708 $55,000 Implemented
UD0625 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,972 $315 Implemented
UD0625 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,095 $4,500 Implemented
UD0625 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,767 $13,700 Not Implemented
UD0625 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $5,466 $2,880 Implemented
UD0625 # 06 Y:2001 06 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,363 $100 Not Implemented
UD0625 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $3,000 Not Implemented
UD0625 # 08 Y:2001 08 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $835 $3,323 Implemented
UM0188 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,363 $1,083 Not Implemented
UM0188 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,080 $500 Not Implemented
UM0188 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,400 $2,800 Not Implemented
UM0188 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $263 $1,020 Not Implemented
UM0188 # 05 Y:2001 05 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $3,333 $1,500 Implemented
MA0488 # 01 Y:2001 01 2001 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $241,800 $250,000 Not Implemented
MA0488 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,500 $1,500 Implemented
MA0488 # 03 Y:2001 03 2001 MINIMIZE WATER USAGE $25,000 $0 Implemented