Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0216 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,605 | $175,000 | Not Implemented |
WV0216 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,413 | $1,000 | Implemented |
WV0216 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,970 | $4,460 | Not Implemented |
WV0216 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $15,557 | $1,500 | Implemented |
WV0216 # 06 Y:2001 | 06 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $99 | $80 | Implemented |
WV0216 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,354 | $75 | Implemented |
WV0216 # 08 Y:2001 | 08 | 2001 | BURN WASTE OIL FOR HEAT | $55,440 | $10,000 | Implemented |
WV0216 # 09 Y:2001 | 09 | 2001 | LEASE EQUIPMENT INSTEAD OF PURCHASING | $2,250 | $200 | Not Implemented |
WV0216 # 10 Y:2001 | 10 | 2001 | CLEAR AND RENT EXISTING SPACE | $6,000 | $500 | Not Implemented |
UD0625 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,708 | $55,000 | Implemented |
UD0625 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,972 | $315 | Implemented |
UD0625 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,095 | $4,500 | Implemented |
UD0625 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,767 | $13,700 | Not Implemented |
UD0625 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,466 | $2,880 | Implemented |
UD0625 # 06 Y:2001 | 06 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,363 | $100 | Not Implemented |
UD0625 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $3,000 | Not Implemented |
UD0625 # 08 Y:2001 | 08 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $835 | $3,323 | Implemented |
UM0188 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,363 | $1,083 | Not Implemented |
UM0188 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,080 | $500 | Not Implemented |
UM0188 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,400 | $2,800 | Not Implemented |
UM0188 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $263 | $1,020 | Not Implemented |
UM0188 # 05 Y:2001 | 05 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $3,333 | $1,500 | Implemented |
MA0488 # 01 Y:2001 | 01 | 2001 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $241,800 | $250,000 | Not Implemented |
MA0488 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $84,500 | $1,500 | Implemented |
MA0488 # 03 Y:2001 | 03 | 2001 | MINIMIZE WATER USAGE | $25,000 | $0 | Implemented |