IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0596 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $1,008 Implemented
CO0596 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,270 $33,120 Implemented
CO0596 # 03 Y:2006 03 2006 INCREASE EFFICIENCY OF TRUCKS $5,740 $0 Implemented
CO0596 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,810 $1,000 Implemented
CO0596 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $2,410 $100 Not Implemented
CO0596 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $9,260 Implemented
CO0596 # 07 Y:2006 07 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,100 $2,950 Not Implemented
CO0596 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $910 $5,740 Implemented
TA0130 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $10,795 $22,000 Implemented
TA0130 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $81 $252 Implemented
TA0130 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,192 $0 Implemented
NC0351 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $9,688 Not Implemented
NC0351 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,135 $1,000 Implemented
NC0351 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $100 Implemented
NC0351 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $885 $1,000 Not Implemented
NC0351 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,475 $4,243 Not Implemented
NC0351 # 02 Y:2006 02 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,147 $2,800 Not Implemented
NC0351 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $58 $39 Implemented
BD0316 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $2,102 Implemented
BD0316 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,033 $675 Implemented
BD0316 # 03 Y:2006 03 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,153 $8,363 Implemented
BD0316 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,724 $1,200 Implemented
BD0316 # 01 Y:2006 01 2006 USE SYNTHETIC LUBRICANT $7,871 $800 Not Implemented
NC0344 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $48,795 $35,000 Not Implemented
NC0344 # 04 Y:2006 04 2006 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $62,722 $50,000 Implemented