Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsNAICS | 321 | Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0447 # 04 Y:2003 | 04 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,460 | $880 | Implemented |
OR0447 # 03 Y:2003 | 03 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $28,720 | $150 | Implemented |
OR0447 # 01 Y:2003 | 01 | 2003 | $105,200 | $7,000 | Implemented | |
OR0446 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,800 | $21,600 | Implemented |
OR0446 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,000 | $8,100 | Implemented |
OR0446 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,100 | $13,000 | Implemented |
OR0446 # 06 Y:2003 | 06 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,780 | $26,000 | Implemented |
OR0444 # 01 Y:2003 | 01 | 2003 | $967,810 | $181,200 | Implemented | |
OR0444 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,210 | $8,170 | Implemented |
OR0443 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,080 | $10,100 | Implemented |
OR0443 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,770 | $665 | Implemented |
WV0281 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,163 | $38 | Implemented |
WV0281 # 03 Y:2003 | 03 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $1,940 | $240 | Implemented |
WV0281 # 04 Y:2003 | 04 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,652 | $1,000 | Implemented |
AS0365 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $790 | $1,643 | Implemented |
AS0365 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $274 | $350 | Implemented |
AS0365 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $290 | $1,535 | Implemented |
AS0365 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,328 | $60 | Implemented |
UF0331 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,423 | $0 | Implemented |
UF0331 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $924 | $1,649 | Implemented |
UF0331 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,837 | $11,405 | Implemented |
UF0331 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Implemented |
UF0331 # 05 Y:2003 | 05 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,190 | $32,481 | Implemented |
UF0331 # 09 Y:2003 | 09 | 2003 | $2,340 | $2,372 | Implemented | |
UF0331 # 08 Y:2003 | 08 | 2003 | $7,000 | $3,000 | Implemented |