Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 3328 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0325 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,604 | $1,660 | Implemented |
MI0325 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,225 | $14,854 | Not Implemented |
MI0325 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,220 | $1,600 | Implemented |
MI0325 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $979 | $3,042 | Implemented |
MI0325 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,058 | $9,700 | Not Implemented |
MI0325 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,645 | $2,520 | Implemented |
MI0325 # 05 Y:2017 | 05 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,801 | $160 | Implemented |
MI0325 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,332 | $4,841 | Not Implemented |
MI0325 # 08 Y:2017 | 08 | 2017 | USE OPTIMUM THICKNESS INSULATION | $1,467 | $388 | Implemented |
SF0511 # 03 Y:2017 | 03 | 2017 | COVER OPEN TANKS | $2,660 | $1,059 | Implemented |
SF0511 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $5,219 | Implemented |
SF0511 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $824 | $1,526 | Implemented |
SF0511 # 01 Y:2017 | 01 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $2,043 | $0 | Implemented |
SF0511 # 02 Y:2017 | 02 | 2017 | REDUCE VENTILATION AIR | $1,680 | $0 | Implemented |
MZ0240 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $8,183 | $2,100 | Implemented |
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |
MZ0240 # 05 Y:2017 | 05 | 2017 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $7,139 | $5,400 | Implemented |
MZ0240 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,206 | $250 | Implemented |
MZ0240 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $806 | $5,500 | Not Implemented |
MZ0240 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,024 | $70,500 | Implemented |
CL1704 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,502 | $900 | Not Implemented |
CL1704 # 04 Y:2017 | 04 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,656 | $3,050 | Not Implemented |
CL1704 # 01 Y:2017 | 01 | 2017 | RECOVER AND REUSE COOLING WATER | $31,006 | $0 | Not Implemented |
CL1704 # 02 Y:2017 | 02 | 2017 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $11,470 | $15,000 | Implemented |
CL1704 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,811 | $21,000 | Implemented |