IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0618 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,050 $640 Implemented
CO0618 # 02 Y:2008 02 2008 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $19,720 $10,000 Implemented
CO0618 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,780 $50,000 Implemented
CO0618 # 03 Y:2008 03 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $5,170 $61,600 Implemented
CO0618 # 01 Y:2008 01 2008 USE POWER DURING OFF-PEAK PERIODS $15,050 $0 Not Implemented
CO0618 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,950 $42,300 Implemented
UW0020 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $403 $145 Implemented
UW0020 # 04 Y:2008 04 2008 UPGRADE CONTROLS ON COMPRESSORS $1,828 $450 Implemented
UW0020 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,000 $24,547 Not Implemented
UW0020 # 01 Y:2008 01 2008 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $115,054 $172,581 Not Implemented
UW0020 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $150 $809 Not Implemented
UW0020 # 03 Y:2008 03 2008 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,002 $34,238 Not Implemented
UA0024 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $14,155 Not Implemented
UA0024 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $1,392 $243 Implemented
UA0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,203 $300 Implemented
UA0024 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,555 $2,415 Implemented
UA0024 # 07 Y:2008 07 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $98,000 $126,000 Not Implemented
UA0024 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,566 $23,000 Not Implemented
UA0024 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $42,744 $45,700 Not Implemented
UA0024 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $1,500 Implemented
UA0024 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,342 $0 Implemented
DL0016 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $19,500 $1,000 Not Implemented
DL0016 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $635 $160 Not Implemented
DL0016 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $3,343 $590 Implemented
DL0016 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $500 Not Implemented