IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0458 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,667 $34,450 Implemented
SD0457 # 11 Y:2012 11 2012 REPAIR AND ELIMINATE STEAM LEAKS $2,233 $200 Implemented
SD0457 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,722 $871 Implemented
SD0457 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,316 $50,240 Implemented
SD0457 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $77,740 $9,900 Implemented
SD0457 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,364 $89,136 Implemented
UD0866 # 15 Y:2012 15 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $9,098 $10,982 Implemented
UD0866 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $28,807 $0 Implemented
UD0866 # 10 Y:2012 10 2012 USE MINIMUM STEAM OPERATING PRESSURE $83,103 $83,103 Implemented
UD0866 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $0 Implemented
UD0866 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,378 $22,134 Implemented
UD0866 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,071 $41,345 Implemented
OK0833 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,700 $5,000 Implemented
OK0833 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $500 Implemented
OK0833 # 08 Y:2012 08 2012 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $31,700 $0 Implemented
OK0833 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $3,400 Implemented
CO0663 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,190 $34,790 Implemented
CO0663 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,450 $32,050 Implemented
CO0663 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,080 $500 Implemented
CO0658 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,660 $550 Implemented
CO0658 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,430 $850 Implemented
UA0081 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,206 $5,100 Implemented
UA0081 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,632 $1,609 Implemented
UA0081 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,459 $480 Implemented
UA0081 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,481 $2,210 Implemented