IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0035 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $594 $0 Implemented
WM0035 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,953 $0 Implemented
WM0035 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,932 $1,000 Implemented
WM0035 # 03 Y:2013 03 2013 REPAIR OR REPLACE STEAM TRAPS $7,478 $1,500 Implemented
WM0035 # 04 Y:2013 04 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,425 $2,270 Implemented
WM0032 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,693 $1,260 Implemented
IA0507 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $792 $650 Implemented
IA0507 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,053 $13,600 Implemented
IA0507 # 09 Y:2013 09 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,196 $10,318 Implemented
IA0507 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $576 $25 Implemented
IA0507 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,342 $1,000 Implemented
IA0507 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $9,686 $7,803 Implemented
IA0507 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,933 $2,826 Implemented
IA0507 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,198 Implemented
IA0507 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,483 $4,993 Implemented
UA0105 # 01 Y:2013 01 2013 REPAIR AND ELIMINATE STEAM LEAKS $6,636 $3,420 Implemented
UA0105 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,189 $596 Implemented
UA0105 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,669 $1,900 Implemented
UA0105 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $1,056 Implemented
UA0105 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,220 $4,669 Implemented
UA0105 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $564 $426 Implemented
DL0111 # 02 Y:2013 02 2013 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $5,281 $1,500 Implemented
DL0111 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $20,400 $25,000 Implemented
DL0111 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $50 Implemented