IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

620

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0224 # 02 Y:2023 02 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,206 $7,560 Implemented
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
UU0224 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,006 $10,650 Implemented
UU0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,006 $51 Implemented
UU0224 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,361 $1,485 Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
LS2302 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,803 $19,030 Implemented
LS2302 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,984 $325 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
LT8368 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $585 $852 Implemented
UW2207 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,161 $0 Implemented
UW2207 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $112 Implemented
UW2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $2,080 Implemented
UF0585 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,858 $44,939 Implemented
UF0585 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $19,210 $10,000 Implemented
UF0585 # 03 Y:2022 03 2022 INSTALL TURBULATORS $6,811 $7,500 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $11,758 $1,342 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
TT0282 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,290 $58,960 Implemented
TT0282 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $816,618 $2,873,364 Implemented