IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0177 # 05 Y:1999 05 1999 RECOVER AND REUSE COOLING WATER $97,444 $35,500 Implemented
NC0177 # 04 Y:1999 04 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $450 $500 Implemented
NC0177 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,366 $2,141 Implemented
NC0177 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $434 $120 Implemented
NC0178 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,173 $2,500 Implemented
NC0178 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $74,238 $5,000 Implemented
NC0178 # 02 Y:1999 02 1999 CHECK FOR ACCURACY OF UTILITY / POWER METERS $14,400 $5,600 Implemented
NC0178 # 01 Y:1999 01 1999 MODIFY TEXTILE DRYERS $72,691 $1,000 Implemented
GT0670 # 05 Y:1999 05 1999 INSTALL COMMON HEADER ON COMPRESSORS $30,991 $5,250 Implemented
GT0670 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,226 $0 Implemented
GT0670 # 01 Y:1999 01 1999 COMBINE UTILITY METERS $512 $0 Implemented
GT0670 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,078 $15,000 Implemented
GT0670 # 08 Y:1999 08 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,397 $64,899 Implemented
GT0670 # 09 Y:1999 09 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $6,000 $4,000 Implemented
GT0667 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $162 $50 Implemented
GT0667 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,292 $18,568 Implemented
ME0269 # 13 Y:1999 13 1999 INSULATE BARE EQUIPMENT $547 $273 Implemented
ME0269 # 12 Y:1999 12 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,273 $1,632 Implemented
ME0269 # 10 Y:1999 10 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,179 $2,000 Implemented
ME0269 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $4,461 $650 Implemented
ME0269 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,202 $10,069 Implemented
ME0269 # 06 Y:1999 06 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,530 $21,460 Implemented
ME0269 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,299 $10,600 Implemented
ME0269 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,324 $1,000 Implemented
ME0269 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,778 $56,288 Implemented