Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
126
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0350 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $399 | $492 | Implemented |
SF0350 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $300 | Implemented |
SF0350 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,274 | $1,332 | Implemented |
OK0753 # 01 Y:2007 | 01 | 2007 | OPTIMIZE PLANT POWER FACTOR | $49,649 | $0 | Implemented |
UW0008 # 01 Y:2007 | 01 | 2007 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $136,932 | $492,147 | Implemented |
UW0008 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $1,092 | $700 | Implemented |
UW0008 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,480 | $11,244 | Implemented |
UW0008 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,830 | $81,585 | Implemented |
LE0264 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,204 | $2,000 | Implemented |
LE0264 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,103 | $2,500 | Implemented |
LE0264 # 01 Y:2007 | 01 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,680 | $50,000 | Implemented |
LE0264 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,084 | $500 | Implemented |
LE0264 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,288 | $1,000 | Implemented |
LE0264 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Implemented |
MS0321 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,742 | $306 | Implemented |
SU0260 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,677 | $490 | Implemented |
SU0260 # 04 Y:2007 | 04 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $685 | $0 | Implemented |
SU0260 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,644 | $1,034 | Implemented |
SU0260 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,228 | $0 | Implemented |
DL0007 # 05 Y:2007 | 05 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $181 | $34 | Implemented |
DL0007 # 07 Y:2007 | 07 | 2007 | REPLACE BOILER | $1,325 | $10,425 | Implemented |
DL0007 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,535 | $140 | Implemented |
DL0007 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,672 | $75 | Implemented |
UM0325 # 01 Y:2007 | 01 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $56,621 | $14,400 | Implemented |
UM0325 # 04 Y:2007 | 04 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,212 | $0 | Implemented |