Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
172
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0925 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,762 | $933 | Implemented |
OK0925 # 06 Y:2015 | 06 | 2015 | USE COMPRESSOR AIR FILTERS | $757 | $362 | Implemented |
OK0925 # 03 Y:2015 | 03 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $160 | $214 | Implemented |
OK0925 # 07 Y:2015 | 07 | 2015 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $6,933 | $5,596 | Implemented |
SU0401 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $383 | $240 | Implemented |
IP0055 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,460 | $3 | Implemented |
SU0401 # 05 Y:2015 | 05 | 2015 | REPLACE BOILER | $11,805 | $10,686 | Implemented |
SU0401 # 02 Y:2015 | 02 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $3,274 | $1,580 | Implemented |
IP0055 # 02 Y:2015 | 02 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,351 | $0 | Implemented |
IP0055 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,177 | $86 | Implemented |
SU0401 # 01 Y:2015 | 01 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,820 | $0 | Implemented |
MZ0192 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,211 | $0 | Implemented |
MZ0192 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,801 | $1,160 | Implemented |
MZ0192 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,360 | $6,100 | Implemented |
MZ0192 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $920 | Implemented |
WV0516 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,706 | $1,288 | Implemented |
TT0162 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,039 | $10,000 | Implemented |
WV0516 # 01 Y:2015 | 01 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $10,801 | $12,000 | Implemented |
WV0516 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,046 | $1,000 | Implemented |
TT0162 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,958 | $3,000 | Implemented |
WV0516 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,248 | $4,483 | Implemented |
WV0516 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,983 | $2,875 | Implemented |
WV0516 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,057 | $105 | Implemented |
NC0554 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,465 | $12,000 | Implemented |
NC0554 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,597 | $4,400 | Implemented |