IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
SIC 31 Leather And Leather Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0142 # 02 Y:2019 02 2019 USE RADIANT HEATER FOR SPOT HEATING $7,329 $9,450 Implemented
WM0142 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $351 $1,115 Implemented
WM0142 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $2,700 Implemented
WM0142 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $1,160 Implemented
WM0142 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $3,500 Implemented
WM0142 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,679 $6,540 Implemented
TT0195 # 07 Y:2017 07 2017 APPLY FOR INVESTMENT INCENTIVES $98 $20 Implemented
TT0195 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $3,050 Implemented
TT0195 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,211 $25 Implemented
SD0493 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,141 $1,250 Implemented
SD0493 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,823 $1,400 Implemented
OK0864 # 04 Y:2013 04 2013 UPGRADE CONTROLS ON COMPRESSORS $5,084 $0 Implemented
OK0864 # 09 Y:2013 09 2013 USE FLUE GAS RECUPERATION TO REDUCE VOC $79,353 $32,100 Implemented
OK0864 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,176 $10,642 Implemented
OK0864 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,158 $10,250 Implemented
OK0755 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $960 $2,000 Implemented
OK0755 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $150 Implemented
OK0755 # 10 Y:2008 10 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $0 Implemented
OK0755 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,231 $4,120 Implemented
OK0755 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $28,144 Implemented
OK0755 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $949 $2,196 Implemented
TA0133 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,060 $367 Implemented
WV0319 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $7,154 $535 Implemented
WV0319 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $3,570 Implemented
WV0319 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $561 $327 Implemented