IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0073 # 09 Y:1989 09 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $236 $0 Implemented
WI0073 # 07 Y:1989 07 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $594 $800 Implemented
WI0073 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $880 $1,000 Implemented
WI0073 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $801 $400 Implemented
WI0073 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,614 $1,003 Implemented
WI0073 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $208 $300 Implemented
TN0386 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,664 $0 Implemented
CO0163 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $340 $130 Implemented
CO0163 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $570 $400 Implemented
CO0163 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $480 $600 Implemented
TN0386 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $659 $500 Implemented
TN0386 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $3,860 Implemented
TN0386 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,995 $9,500 Implemented
CO0163 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $500 Implemented
OR0058 # 02 Y:1989 02 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,976 $200 Implemented
OR0058 # 04 Y:1989 04 1989 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,914 $200 Implemented
MA0154 # 02 Y:1989 02 1989 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $882 $2,892 Implemented
OR0058 # 08 Y:1989 08 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $847 $1,170 Implemented
OR0058 # 07 Y:1989 07 1989 COVER OPEN TANKS $1,428 $0 Implemented
OR0058 # 01 Y:1989 01 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $8,281 $0 Implemented
MA0154 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,565 $12,000 Implemented
TN0370 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,038 $0 Implemented
TN0370 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $6,433 $560 Implemented
TN0367 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,986 $14,400 Implemented
TN0367 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,618 $510 Implemented