IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

874

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
WM0197 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,111 $870 Implemented
WM0197 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,789 $1,875 Implemented
WM0197 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,680 $41,043 Implemented
AM0835 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $243 $308 Implemented
AM0835 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $310 $36 Implemented
AM0835 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $810 $0 Implemented
AM0835 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,885 $8,600 Implemented
AM0835 # 03 Y:2022 03 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,870 $0 Implemented
AM0835 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $4,178 $15,055 Implemented
AM0835 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,925 $2,265 Implemented
AM0829 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $35,850 $3,600 Implemented
AM0829 # 02 Y:2021 02 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,580 $5,720 Implemented
AM0829 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $7,640 $15,900 Implemented
IC0234 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,669 $32,097 Implemented
IC0234 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,075 $3,800 Implemented
IC0234 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,059 $3,380 Implemented
IC0234 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,418 $1,107 Implemented
IC0228 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,679 $14,948 Implemented
IC0228 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $9,605 $2,359 Implemented
WM0151 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,432 $3,450 Implemented
WM0151 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,501 $500 Implemented
GT0937 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,545 $4,311 Implemented
GT0937 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $1,362 $310 Implemented