IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0069 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $6,558 $7,600 Not Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
UA0069 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $596 $398 Not Implemented
UA0061 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223,288 $22,500 Implemented
UA0061 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $224,396 $387,720 Not Implemented
UA0061 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,256 $85,000 Not Implemented
UA0061 # 04 Y:2011 04 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $98,700 $112,800 Not Implemented
UA0061 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $164,422 $19,809 Not Implemented
UA0061 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $411,224 $71,550 Not Implemented
UA0059 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,193 $640 Implemented
UA0059 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,648 $2,500 Implemented
UA0059 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $68,973 $399,000 Not Implemented
UA0059 # 04 Y:2011 04 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,673 $29,278 Not Implemented
UA0059 # 05 Y:2011 05 2011 USE RADIANT HEATER FOR SPOT HEATING $10,002 $14,840 Not Implemented
UA0059 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,017 $2,280 Not Implemented
UA0059 # 07 Y:2011 07 2011 DISCONNECT BALLASTS $3,883 $2,310 Not Implemented
UA3014 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $78,640 $8,320 Implemented
UA3014 # 02 Y:2011 02 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $71,901 $30,750 Not Implemented
UA3014 # 03 Y:2011 03 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $72,048 $98,000 Not Implemented
UA3014 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,700 $60,860 Not Implemented
UA3014 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $20,767 $13,730 Implemented
UA3014 # 06 Y:2011 06 2011 DISCONNECT BALLASTS $5,801 $405 Implemented
UA3014 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $29,663 $26,400 Not Implemented
UA3014 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92,285 $51,748 Not Implemented
UA3014 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269,372 $630,225 Not Implemented