Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0631 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,478 | $6,067 | Implemented |
OK0631 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $13,831 | $8,000 | Implemented |
OK0631 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $174,720 | $364,000 | Implemented |
OK0631 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,487 | $400 | Implemented |
OK0631 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $1,991 | $194 | Implemented |
OK0625 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,642 | $1,408 | Not Implemented |
OK0628 # 09 Y:2001 | 09 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $5,452 | $500 | Not Implemented |
OK0628 # 08 Y:2001 | 08 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $456,570 | $93,000 | Not Implemented |
OK0628 # 07 Y:2001 | 07 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,767 | $5,653 | Not Implemented |
OK0628 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $75,988 | $752 | Implemented |
OK0628 # 05 Y:2001 | 05 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $39,477 | $20,922 | Implemented |
OK0628 # 04 Y:2001 | 04 | 2001 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,448 | $1,500 | Implemented |
OK0628 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,940 | $3,013 | Implemented |
OK0628 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $357 | $613 | Implemented |
OK0628 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $8,150 | $310 | Implemented |
OK0625 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,200 | $30,400 | Implemented |
OK0625 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,782 | $95,000 | Implemented |
OK0625 # 05 Y:2001 | 05 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $868 | $230 | Implemented |
OK0625 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $376 | $476 | Implemented |
OK0625 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,851 | $84 | Implemented |
OK0625 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $360 | Implemented |
OK0628 # 10 Y:2001 | 10 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,112 | $100,000 | Not Implemented |
OK0616 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,349 | $21,884 | Not Implemented |
OK0616 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,001 | $25,778 | n/a |
OK0616 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,387 | $4,428 | Implemented |