IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0397 # 04 Y:2005 04 2005 REDUCE SCRAP PRODUCTION $474 $150 Not Implemented
AS0397 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $520 $250 Not Implemented
AS0394 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,769 $3,632 Not Implemented
AS0394 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,219 $1,000 Not Implemented
AS0394 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,961 $321 Not Implemented
AS0394 # 04 Y:2005 04 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $71,792 $33,000 Not Implemented
AS0394 # 05 Y:2005 05 2005 $443,040 $453,047 Implemented
AS0389 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,306 $12,480 Not Implemented
AS0389 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,163 $1,698 Implemented
AS0389 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $506 Not Implemented
AS0389 # 04 Y:2004 04 2004 USE GRAVITY FEEDS WHEREVER POSSIBLE $345 $150 Not Implemented
AS0389 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,971 $7,343 Implemented
AS0378 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,302 $480 Implemented
AS0378 # 02 Y:2004 02 2004 $3,270,456 $3,624,320 Not Implemented
AS0378 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,133 $506 Not Implemented
AS0378 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,081 $499 Implemented
AS0378 # 05 Y:2004 05 2004 USE OPTIMUM THICKNESS INSULATION $638 $360 Not Implemented
AS0378 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,918 $12,008 Implemented
AS0378 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,906 $6,178 Implemented
AS0377 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,088 $120 Implemented
AS0377 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $5,750 Implemented
AS0377 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,140 $20 Implemented
AS0377 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $1,236 $30 Implemented
AS0377 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $401 $816 Implemented
AS0377 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $193 $344 Implemented