IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0519 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $830 Implemented
AS0518 # 01 Y:2022 01 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,267 $226,584 Not Implemented
AS0518 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $22,746 $3,707 Not Implemented
AS0518 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $21,371 $9,286 Not Implemented
AS0518 # 04 Y:2022 04 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $16,536 $3,537 Not Implemented
AS0518 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,420 $3,762 Not Implemented
AS0518 # 06 Y:2022 06 2022 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $391 $1,619 Not Implemented
AS0517 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,690 $126,497 Not Implemented
AS0517 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,446 $48,382 Not Implemented
AS0517 # 03 Y:2022 03 2022 USE OPTIMUM THICKNESS INSULATION $10,522 $15,516 Implemented
AS0517 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,331 $39,600 Implemented
AS0517 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,692 $2,880 Not Implemented
AS0517 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,189 $859 Implemented
AS0517 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,256 $1,541 Implemented
AS0516 # 01 Y:2022 01 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $24,479 $45,639 Not Implemented
AS0516 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $407 $133 Implemented
AS0516 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,894 $22,335 Not Implemented
AS0516 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,838 $170,361 Implemented
AS0516 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $49 $165 Implemented
AS0516 # 06 Y:2022 06 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $278 $189 Not Implemented
AS0515 # 01 Y:2022 01 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $125,792 $20,098 Implemented
AS0515 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $30,224 $146,764 Not Implemented
AS0515 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,340 $9,935 Not Implemented
AS0515 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,528 $28,033 Implemented
AS0515 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,571 $72,520 Implemented