IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0488 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,980 $0 Implemented
SF0488 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,509 $840 Implemented
SF0488 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $6,138 $882 Implemented
SF0488 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,183 $1,469 Implemented
SF0488 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,217 $44,943 Implemented
SF0489 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,223 $350 Implemented
SF0489 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,283 $39,636 Implemented
SF0489 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,079 $8,593 Implemented
SF0485 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,701 $0 Implemented
SF0485 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,294 $0 Implemented
SF0485 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,665 $0 Implemented
SF0485 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,614 $154,359 Implemented
SF0485 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $5,132 $16,334 Implemented
SF0483 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,773 $0 Implemented
SF0483 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,441 $2,520 Implemented
SF0483 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,855 $16,147 Implemented
SF0483 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,458 $15,229 Implemented
SF0482 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,467 $0 Implemented
SF0482 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,190 $13,256 Implemented
SF0482 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $4,739 $14,109 Implemented
SF0477 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,727 $0 Implemented
SF0477 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $22,945 $0 Implemented
SF0477 # 04 Y:2016 04 2016 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $15,446 $7,297 Implemented
SF0477 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,250 $2,903 Implemented
SF0477 # 06 Y:2016 06 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $57,609 $52,742 Implemented