IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0457 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,420 $21,352 Implemented
SF0442 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,021 $0 Implemented
SF0442 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,864 $2,722 Implemented
SF0442 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,082 $12,459 Implemented
SF0442 # 05 Y:2014 05 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $231 $1,559 Implemented
SD0477 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,263 $200 Implemented
SD0437 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,730 $2,850 Implemented
SD0437 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $700 Implemented
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
SF0378 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,697 $0 Implemented
SF0378 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,063 $500 Implemented
SD0413 # 02 Y:2009 02 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $57,036 $120,000 Implemented
SD0413 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $31,920 $13,200 Implemented
SD0413 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,991 $20,850 Implemented
SD0413 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,118 $9,600 Implemented
SD0413 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,623 $13,300 Implemented
SD0413 # 07 Y:2009 07 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,800 $2,000 Implemented
SD0413 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,905 $13,511 Implemented
SF0348 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $0 Implemented
SF0348 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $865 $2,974 Implemented
SF0348 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $16,819 Implemented
SF0348 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $1,020 Implemented
SF0340 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,354 $0 Implemented
SF0340 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $12,059 $320 Implemented
SF0340 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $6,510 $0 Implemented