Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsNAICS | 3327 | Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0640 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,059 | $77,697 | Implemented |
SD0640 # 01 Y:2023 | 01 | 2023 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $11,699 | $6,300 | Implemented |
SD0640 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,095 | $3,366 | Implemented |
SD0639 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,294 | $90,412 | Implemented |
SD0639 # 02 Y:2023 | 02 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,758 | $0 | Implemented |
SD0639 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,572 | $31,410 | Implemented |
SD0639 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,271 | $4,317 | Implemented |
SD0639 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,109 | $18,901 | Implemented |
SD0639 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,370 | $18,675 | Implemented |
SD0639 # 07 Y:2023 | 07 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $69,455 | $136,016 | Implemented |
SJ0001 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,201 | $0 | Not Implemented |
SJ0001 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,845 | $236,368 | Not Implemented |
SJ0001 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,541 | $0 | Not Implemented |
SJ0001 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,785 | $1,200 | Not Implemented |
SJ0001 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $480 | $0 | Not Implemented |
SF0568 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,828 | $70,690 | Implemented |
SF0568 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,914 | $0 | Implemented |
SF0568 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,183 | $400 | Not Implemented |
SF0568 # 05 Y:2021 | 05 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $26,520 | $43,936 | Not Implemented |
SF0568 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $40,609 | $0 | Not Implemented |
SF0568 # 04 Y:2021 | 04 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,048 | $860 | Implemented |
SF0567 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,911 | $0 | Implemented |
SF0567 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,406 | $3,350 | Implemented |
SF0567 # 04 Y:2021 | 04 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $24,340 | $29,296 | Not Implemented |
SF0567 # 06 Y:2021 | 06 | 2021 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,900 | $0 | Not Implemented |