IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

377

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0352 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,377 $360 Implemented
SF0280 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,356 $8,280 Implemented
SF0280 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,656 $2,160 Implemented
SF0280 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,196 $0 Implemented
LM0072 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $0 Implemented
LM0072 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $0 Implemented
LM0072 # 04 Y:2004 04 2004 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,061 $0 Implemented
LM0072 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $102 $96 Implemented
LM0072 # 06 Y:2004 06 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,201 $0 Implemented
SF0267 # 14 Y:2003 14 2003 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,500 $0 Implemented
SF0267 # 15 Y:2003 15 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,500 $9,900 Implemented
SF0267 # 16 Y:2003 16 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,500 $18,000 Implemented
SF0267 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,463 $14,493 Implemented
SF0267 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,206 $3,741 Implemented
SF0267 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,821 $3,895 Implemented
SF0267 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39,106 $0 Implemented
SF0267 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,510 $0 Implemented
SF0267 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,672 $0 Implemented
SD0323 # 06 Y:2003 06 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,436 $1,116 Implemented
SD0323 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,042 $41,000 Implemented
SF0259 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $731 $100 Implemented
SF0259 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $4,760 $300 Implemented
SF0259 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $173,236 $360,625 Implemented
SF0259 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,606 $9,060 Implemented
SF0259 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,735 $23,266 Implemented