IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0306 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,478 $5,000 Not Implemented
SD0306 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,468 $0 Implemented
SD0306 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,521 $6,822 Not Implemented
SD0306 # 03 Y:2002 03 2002 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,708 $1,000 Not Implemented
SD0306 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,006 $240 Not Implemented
SD0306 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,205 $23,000 Not Implemented
LM0044 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,530 $3,825 Not Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
LM0044 # 07 Y:2002 07 2002 $5,695 $300 Not Implemented
LM0044 # 06 Y:2002 06 2002 $159,315 $6,792 Not Implemented
LM0044 # 05 Y:2002 05 2002 $216,000 $3,400 Implemented
LM0044 # 04 Y:2002 04 2002 $14,885 $0 Implemented
LM0044 # 03 Y:2002 03 2002 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,678 $2,120 Not Implemented
SD0302 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,000 $10,000 Not Implemented
SD0302 # 08 Y:2002 08 2002 PAY UTILITY BILLS ON TIME $427 $0 Implemented
SD0302 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,228 $0 Not Implemented
SD0302 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $964 $800 Not Implemented
SD0302 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,968 $12,000 Not Implemented
SD0302 # 07 Y:2002 07 2002 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $5,210 $6,000 Not Implemented
SD0302 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,323 $34,000 Not Implemented
SD0302 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $6,262 $2,000 Not Implemented
LM0040 # 08 Y:2002 08 2002 $13,000 $3,900 Not Implemented
LM0040 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,685 $450 Not Implemented
LM0040 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,476 $288 Implemented
LM0040 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,360 $1,440 Not Implemented