IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

496

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0597 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,897 $3,900 Not Implemented
SD0597 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,822 $17,000 Not Implemented
SD0580 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $426 $450 Implemented
SD0580 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,534 $0 Implemented
SD0580 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,083 $32,660 Implemented
SD0580 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,167 $126,000 Implemented
SF0523 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,710 $163,709 Implemented
SF0523 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $204 Implemented
SF0523 # 02 Y:2018 02 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $386 Implemented
SD0565 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $157 $400 Not Implemented
SD0565 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $451 $700 Implemented
SD0565 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,534 $2,950 Implemented
SD0565 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,738 $11,315 Implemented
SD0565 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $14,497 $72,900 Not Implemented
SD0565 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,815 $6,140 Implemented
SD0556 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,675 $3,790 Not Implemented
SD0556 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $57,756 $205,000 Implemented
SD0556 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,797 $36,600 Not Implemented
SD0556 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,198 $27,633 Implemented
SD0556 # 05 Y:2017 05 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,046 $53,400 Implemented
SD0556 # 06 Y:2017 06 2017 COVER OPEN TANKS $18,591 $10,800 Implemented
SD0556 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,514 $21,100 Implemented
SD0556 # 08 Y:2017 08 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,696 $2,740 Not Implemented
SD0556 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,278 $16,770 Not Implemented
SD0556 # 10 Y:2017 10 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,658 $10,285 Not Implemented